Downstairs Bath: Before and After


DSC02498

Before: Tiny-feeling room with no windows and a 7-foot ceiling.

ry=400

Demolition: Tearing out plaster while living in the house.

 

100_1733

Between: Drywall is hung and mudded and repair work on the floor begins.

100_1736

Between: Shower walls, shelf and bench have taken shape.

100_1734

 

Window, electrical and plumbing are installed.

100_1739

The beginning of a week-long process to water proof the shower floor and walls.

100_1815

Laying the shower tile.

100_1820

 

100_1843

Cleaning grout residue off the tile.

100_1853

 

Watson would just sit in here with us and watch us work.

100_1851

Sink #1 is installed and the plumbing is working!  Watson approves.

Benjamin Moore Ice Cube Silve

Finished!  Sink # 1

Benjamin Moore Ice Cube Silve

Toilet area.

Benjamin Moore Ice Cube Silve

Sink #2.

Benjamin Moore Ice Cube Silve

Walk-in shower.

Advertisements

2 thoughts on “Downstairs Bath: Before and After

  1. Brilliant job! Especially with the tiling, it can be difficult to get tiles looking that good, it is so important to have the best equipment to do the job to give it such a professional look.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s